The purpose of the 145th and Grover Sanitary Sewer Relocation project is to permanently relocate a sanitary sewer pipe that has been temporarily repaired and stabilized. The temporary repair is located in the creek bank just north of Grover Street and west of 145th Street. During heavy storm water runoff in March 2019, the creek bank eroded, which exposed and damaged a section of the sanitary sewer pipe. While evaluating the repairs to the sewer pipe, it was determined that re-routing the sewer outside of the creek bank channel would be the most reliable long-term solution due to steep creek bank slopes, limited access through private property, and a limited easement area.
The first phase of the project is the study phase, where alternatives for relocating the sanitary sewer main will be evaluated.
The following parameters will be reviewed:
These measures will be evaluated to provide a reliable sanitary sewer alignment with the most effective
long-term solution.
Check back in Fall 2022 for what to expect during construction.
There are currently no upcoming events.
Materials from past outreach events will eventually be available here.
Check back later for documents and materials assoicated with this project.